Turnkey Projects

Sports Infrastructure & Turnkey Court Construction

From empty space to play-ready facility, most indoor courts in 7–21 days.

Every enterprise campus has underutilised space. sportsOS audits it, designs the right layout, procures the right equipment and installs it to the sport's association standard (BWF, FIBA and the like), then hands it back with a maintenance plan already in place.

7–21 Days for most indoor courts

From site sign-off. Outdoor and enclosed courts take 3 to 6 weeks

16 Sports disciplines

Badminton, gym, table tennis, cricket nets, yoga rooms and more

100% GST-compliant procurement

Full documentation for enterprise finance approval

What's Included

Design. Procure. Install. Hand over.

The full infrastructure lifecycle, from blank floor plan to your first booked court, managed by sportsOS.

Site Audit & Space Planning

We measure, analyse ceiling heights, flooring conditions, lighting and ventilation, then propose the optimal sport layout for your space.

Design & Floor Plan

Court layouts, equipment zones, safety buffers and spectator space, designed to BWF, AIFF or relevant sport governing body standards.

Equipment Procurement

Sourced from verified vendors, GST-invoiced and delivered to campus, poles, nets, flooring tiles, gym equipment, court lines and accessories.

Professional Installation

Trained installation teams handle court marking, flooring, net assembly, lighting placement and all finishing work to safety spec.

Quality Handover

Full photographic documentation, equipment warranty register and a maintenance schedule, so day-one operations are smooth.

AMC Transition

On request, the new facility moves straight onto our Annual Maintenance Contract, with no gap in upkeep.

Surfaces & Timelines

What each court is built on, and how long it takes.

Indoor courts and rooms are usually play-ready in 7 to 21 days from site sign-off. Outdoor and enclosed courts take longer because the base, walls or enclosure are built on site.

SportSurface optionsTypical install time
BadmintonPU synthetic (4.5 mm minimum) or wooden sprung floor7 to 14 days
PickleballAcrylic or cushioned synthetic10 to 18 days
BasketballMaple hardwood, vinyl or outdoor acrylic7 to 12 days
FutsalArtificial turf on a shock pad5 to 10 days
TennisAcrylic hard court, synthetic turf or interlocking tiles3 to 5 weeks
PadelArtificial turf inside a glass and mesh enclosure4 to 6 weeks
SquashMaple or vinyl floor, plaster or glass walls3 to 5 weeks
Cricket netsPitch matting inside netted bays3 to 5 days
Table tennisITTF-regulation tables2 to 3 days
Corporate gymRubber flooring, cardio and strength zones5 to 7 days
Yoga studioSprung flooring, mirrors and acoustic panels3 to 5 days

Times run from site sign-off to a playable facility and assume the site is ready. For a side-by-side look at the flooring options, read our PU, acrylic, vinyl and wood flooring comparison.

How It Works

Four steps from empty floor to first match.

01

Site Audit

We visit your campus, measure usable space, and identify feasible sports for your footprint and headcount.

Free · 1 day
02

Design Proposal

You receive a floor plan, equipment list, installation timeline and total cost, all in 48 hours.

48h turnaround
03

Installation

Our team procures, delivers and installs. You don't manage a single vendor, just approve the final walkthrough.

Most in 7–21 days
04

Handover & Launch

Documentation, warranty register, usage guidelines and optional AMC, then your employees play on day one.

SLA-backed
Built For

Campuses with space and no clear plan for it.

Most GCC and enterprise campuses have underutilised terraces, basements, or ground-floor areas earmarked for "recreation" but never activated. sportsOS converts that intent into actual infrastructure, fast.

We handle every stakeholder: facilities, finance, HR and building management, so the project moves without you chasing vendors.

Facility Managers
Space planning, installation oversight, quality sign-off
Administration Heads
Vendor management, timeline accountability, GST compliance
HR & Workplace Teams
Employee experience, sports program readiness
Procurement / Finance
GST invoices, cost estimates, vendor consolidation
FAQ

Questions about building a sports facility on campus

What does a turnkey sports infrastructure project include? +

Six stages, run by one team: a site audit and space plan, a court or room design to the relevant governing body standard, equipment procurement with GST invoices, professional installation, a documented handover with photographs, a warranty register and a maintenance schedule, and an optional move onto an annual maintenance contract.

How long does it take to build a sports court? +

Most indoor courts and rooms are play-ready in 7 to 21 days from site sign-off: table tennis in 2 to 3 days, a futsal court in 5 to 10 days, a badminton court in 7 to 14 days. Outdoor and enclosed courts take longer: tennis and squash 3 to 5 weeks, padel 4 to 6 weeks.

Which sports facilities can sportsOS build? +

Sixteen: badminton, table tennis, pickleball, squash, padel, tennis, basketball, futsal, cricket nets, corporate gyms, yoga studios, carrom, chess, billiards and pool, foosball and air hockey.

How much does a sports court cost? +

It depends on the footprint, the surface and the equipment, so there is no fixed price list. After a free one-day site audit you receive a floor plan, equipment list, installation timeline and total cost within 48 hours.

Will we have to manage separate vendors? +

No. sportsOS procures, delivers and installs everything, with GST invoices for your finance team. Your team approves the design and signs off the final walkthrough.

What happens after the facility is handed over? +

You receive the documentation, warranty register, usage guidelines and a maintenance schedule. If you want the facility kept in match condition, it can move straight onto a sportsOS sports facility AMC with no gap in upkeep.

Need a cost for your own space? Get project pricing after a free site audit.

Get Started

Let's see what your campus space can become.

Free site audit. Floor plan and cost proposal in 48 hours. No commitment.

Free Download  ·  13 pages

sportsOS Campus Operations Deck

Turnkey delivery timelines, AMC options, facility snapshots and pricing framework for enterprise campuses.

No spam. Used only to follow up on your enquiry.